| Require new public facilities to be located outside of areas susceptible to sea level rise and increased coastal flooding. |
Erosion and Shoreline RecessionFlooding – Coastal |
Property |
National |
HUD Community Resilience Toolkit (p. 11) |
| Update zoning requirements to prevent the location of key food infrastructure in the floodplain. |
Flooding – CoastalFlooding – GeneralFlooding – Rainfall-induced |
Agriculture and Food Supply |
Southeast |
Triangle Region, NC Regional Resilience Assessment (p. 196 (pdf p. 208)) |
| Discourage public water distribution and treatment structures in hazard-prone areas and use 3D visualization (GIS) to help convey the information. |
Flooding – Rainfall-induced |
Water Infrastructure – General |
Southeast |
Triangle Region, NC Regional Resilience Assessment |
| Locate utilities and critical facilities outside of areas susceptible to erosion or landslides to decrease the risk of service disruption. |
LandslidesErosion and Shoreline Recession |
Critical FacilitiesEnergy and Utilities |
National |
HUD Community Resilience Toolkit (p. 27) |
| Evaluate climate-related risks for sludge and biosolids mobility, contamination, storage, and/or processing. Ensure sludge and sewage processing facility placement and design minimize health and environmental |
Water Quality |
Water Infrastructure – Wastewater |
Northeast |
Vermont Climate Action Plan (p. 150 (pdf p. 158)) |