| Require access-limited communities to have a right-of-way access point that can used during an emergency (e.g., a greenway with bollards that lower for driving when flood occurs). |
Flooding – GeneralFlooding – Rainfall-induced |
Transportation and Mobility |
Southeast |
Triangle Region, NC Regional Resilience Assessment (p. 201 (pdf p. 213)) |
| Require that new development develop a transportation access plan to ensure that are multiple ingresses and egresses. |
LandslidesWildfireFlooding – CoastalFlooding – GeneralFlooding – Rainfall-induced |
Transportation and Mobility |
Southeast |
Triangle Region, NC Regional Resilience Assessment (p. 201 (pdf p. 213)) |
| Require transportation access plan agreements for all large developments. |
LandslidesMultiple or All HazardsWildfireFlooding – CoastalFlooding – General |
Transportation and MobilityProperty |
Northeast |
Climate Ready Boston - Resilience Initiatives |