| Work with utility companies to address local impacts of power operations. |
Air Quality |
Energy and Utilities |
Northeast |
(p. 72) |
| Provide cooling systems for municipal and county assets and equipment sensitive to overheating. |
Extreme Heat |
Critical Facilities |
Southwest |
Climate Resilient San Diego (p. 58 (pdf p. 64)) |
| Build electricity grid resilience by increasing system capacity, increasing tension in lines to reduce sag and adding external coolers to transformers. Lines and transformers may overheat and trip off |
Extreme Heat |
Energy and Utilities |
InternationalNational |
AR5 Climate Change: Impacts, Adaptation, and Vulnerability (p. Table 10-2 on page 669) |
| Encourage utility companies to raise electrical transformers onto gravel pads to protect them from inundation. |
Flooding – CoastalFlooding – GeneralFlooding – Rainfall-induced |
Energy and Utilities |
|
Climate Change in Port Heiden, AK (p. 43) |
| Encourage utility companies to harden energy infrastructure systems (e.g., poles, lines) against damage from climate-related effects and expand redundancy in the energy network. |
High WindsLandslidesMultiple or All HazardsSevere Winter WeatherWildfireExtreme HeatFlooding – CoastalFlooding – General |
Energy and Utilities |
Southwest |
Statewide Summary Report: California's Fourth Climate Change Assessment |
| Beyond strengthening existing systems, increase system redundancy to protect critical infrastructure from power outages. |
High WindsLandslidesMultiple or All HazardsSevere Winter WeatherWildfireExtreme HeatFlooding – CoastalFlooding – General |
Critical FacilitiesEnergy and UtilitiesMultiple or All Assets |
Northeast |
City of Baltimore Disaster Preparedness and Planning Project (p. 147) |
| Bury distribution lines to make them more resilient during hurricanes, severe winter weather and wildfires. |
High WindsSevere Winter WeatherWildfire |
Energy and Utilities |
Southeast |
Triangle Region, NC Regional Resilience Assessment (p. 205 (pdf p. 217)) |
| Encourage utility companies to harden electric grid systems (e.g., poles, lines) to withstand abnormally high wind conditions. |
High Winds |
Energy and Utilities |
Southeast |
West Palm Beach, FL - Rethink Paradise: Sustainability Action Plan |
| Identify steps to get the correct certifications on community-constructed electrical and plumbing systems. |
Shifting Species, Habitats, and Ecosystems |
Critical Facilities |
|
Climate Change in Port Heiden, AK (p. 46) |
| Consider burying electrical lines underground. |
Wildfire |
Energy and Utilities |
Southeast |
Miami Forever Climate Ready Strategy |
| Encourage local utilities to upgrade infrastructure with fire-resistant materials and enhance fire protection and response equipment and capability at the utility plant. |
Wildfire |
Critical FacilitiesEnergy and Utilities |
Northwest |
City of Seattle, WA: Preparing for a Changing Climate (p. 27 (pdf p. 60–61)) |